ADU Builder in Lomita, CA: Permits, Fees and Costs

Building an ADU in Lomita means a city building permit, a decision on a complete application within 60 days, and L Square prefab unit prices from $180,000 to $354,000. Call (949) 374-7980.

How do I get an ADU permit in Lomita?

Lomita now runs its own building permit counter. The city states that it provides all Building and Safety services, including plan check, permitting and inspections, and that records from the Los Angeles County Building and Safety Division have been transferred to the city. Planning and building are separate steps. The Planning Division reviews an ADU as a Pre-Review for Building Permit, which the city describes as staff level review for ministerial projects that meet all aspects of the code and permitted by right land uses, including accessory dwelling units. After the city approves the planning review, the owner coordinates the building permit, plan check and inspections. Applications go in online through the city portal, and the building division uses the GeoCivix Building and Permitting Portal where an applicant submits plans, pays plan review fees, gets electronic comments, tracks review status, resubmits revised plans, obtains permits and requests inspections. The building counter serves the public Monday through Thursday and every other Friday, and the planning counter is open in the morning and mid afternoon.

How long does it take to get an ADU permit in Lomita?

State law sets the clock and Lomita works to it. The permitting agency has to tell you in writing whether your application is complete within 15 business days of receiving it, then approve or deny a complete application within 60 days. If the city does not act within 60 days, the application is approved by operation of law. A request from the applicant for a delay stops the clock for the length of that delay. The city itself does not publish a separate ADU review timeline on its Planning or Building pages, so treat 60 days as the outside limit rather than a target and submit a complete set the first time.

What does the City of Lomita charge for an ADU permit?

Lomita adopted a citywide Master Fee Schedule that took effect June 4, 2025. The Community Development Department planning section lists Pre-Review for Building Permit at $187.13 and Pre-Application Meeting at $418.30, and the Building and Safety section lists LA County Building Fees as 100% above the county fee under Resolution No. 99-21, plus a General Plan Update Fee of 5% of the building permit fee. Public Works lists Grading Plan Check for up to 1,000 cubic yards at $196.77 plus a consultant or LA County cost. On state law limits, no impact fee applies to an ADU with 750 square feet of interior livable space or less, or to a junior ADU of 500 square feet or less, and any impact fee above 750 square feet has to be charged in proportion to the primary dwelling floor area.

How much does an ADU cost in Lomita?

L Square publishes configured prefab unit prices the same way for every project: $180,000 for Model 600, $240,000 for Models 800A and 800B, $295,000 for Models 1000A and 1000B, and $354,000 for Model 1200. Those are unit prices, not a final project total for a specific house. A Lomita quote also carries the site work the lot needs, such as utility connections and trenching, grading on a sloped pad, drainage work and structural engineering. Lomita's own submittal checklist asks for a grading and drainage plan whenever the total volume of earth to be moved is 20 cubic yards or more, or the work includes 3 feet of fill or cut, and for a boundary and topographic survey for all new buildings and additions. City fees, plan check and any impact fee are separate line items from the unit price, and the written proposal should list them.

What are the ADU size, height and parking rules in Lomita?

Lomita's own pages do not publish a separate ADU handout with local size, height or parking numbers, so the state floor is what your plan has to clear. A detached unit can have a total floor area of up to 1,200 square feet, and it needs a setback of no more than four feet from the side and rear lot lines. The city may not apply a development standard that blocks a unit with at least 800 square feet of interior livable space built with four foot side and rear yard setbacks. Height is 16 feet for a detached unit, 18 feet for a detached unit within one-half of one mile walking distance of a major transit stop, and 25 feet or the zoning height limit, whichever is lower, for an attached unit. Parking requirements cannot exceed one space per unit or per bedroom, whichever is less, and no replacement off street parking can be required when a garage or carport is converted to an ADU. A city may not add an owner-occupancy requirement, though it can require rentals of 30 days or longer.

Official Lomita ADU sources

  • The City of Lomita Building and Safety Division page states that the city is now providing all Building and Safety services, including plan check, permitting and inspections, and that all records from the Los Angeles County Building and Safety Division have been transferred to the city. The page describes the GeoCivix Building and Permitting Portal, through which an applicant submits building plans, pays plan-review fees, tracks review status, obtains permits and requests inspections. Official source
  • The City of Lomita Planning Division page states that Pre-Review for Building Permit is used for staff level review only, covering ministerial projects that are over the counter applications and administrative site plan reviews, and that it typically applies to development projects that meet all aspects of the code and permitted by right land uses, including accessory dwelling units. The page also states that after a city approval the owner is responsible to coordinate with the county Building and Safety Division to obtain permits and inspections. Official source
  • The City of Lomita Master Fee Schedule effective June 4, 2025 lists under the Community Development Department planning section: Pre-Review for Building Permit at $187.13 and Pre-Application Meeting at $418.30. Under Building and Safety it lists LA County Building Fees at 100% above county fee under Resolution No. 99-21, and a General Plan Update Fee of 5% of the Building Permit Fee. Under Public Works it lists Grading Plan Check up to 1,000 cubic yards at $196.77 plus Consultant or LA County Cost. The schedule states it was amended by City Council on June 3, 2025. Official source
  • The City of Lomita Planning Division Submittal Requirements checklist states that an application is filed through the Lomita Application Portal online along with the filing fee and project plans in PDF, and that all applications for a development project must include architectural drawings to a set scale. It states that a grading and drainage plan is required for all new development, or for grading modifications to an existing property if the total volume of earth to be moved is 20 cubic yards or greater, or if it includes 3 feet of fill or cut. Official source
  • The City of Lomita Online Permitting page states that planning permits and code violations can be processed online through the Community and Economic Development Department's ViewPoint Cloud software, which allows applicants to submit an application and payment from anywhere 24/7, monitor the status of the application online, and receive notifications by email as the application is reviewed and processed. It lists the Planning applications that can be submitted online, including Administrative Applications, Discretionary Approvals and Residential Property Reports. Official source
  • Government Code Section 66314 states that the total floor area for a detached accessory dwelling unit shall not exceed 1,200 square feet, and that a setback of no more than four feet from the side and rear lot lines is required for a unit that is not converted from an existing structure. It states that parking requirements shall not exceed one parking space per accessory dwelling unit or per bedroom, and that when a garage or carport is demolished for an accessory dwelling unit or converted to one, the local agency shall not require that those off street parking spaces be replaced. Official source
  • Government Code Section 66317 states that the permitting agency must notify the applicant in writing, not later than 15 business days after receiving the application, whether the application is complete for the purpose of permitting an accessory dwelling unit. It states that the permitting agency shall either approve or deny the application to create or serve an accessory dwelling unit within 60 days of receiving a completed application, and that if the local agency has not approved or denied the completed application within 60 days, the application shall be deemed approved. Official source
  • Government Code Section 66321 states that a local agency shall not apply a development standard, such as a height limit, setback, floor area ratio or lot coverage ratio, that prevents an accessory dwelling unit with at least 800 square feet of interior livable space and four-foot side and rear yard setbacks from being built in compliance with all other local development standards. It states a height of 16 feet for a detached unit, 18 feet for a detached unit within one-half of one mile walking distance of a major transit stop, and 25 feet or the local zoning height limit for an attached unit. Official source
  • Government Code Section 66311.5 states that a local agency, special district or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less, or a junior accessory dwelling unit that has 500 square feet of interior livable space or less, and that any impact fees charged for an accessory dwelling unit that has more than 750 square feet of interior livable space shall be charged proportionately in relation to the square footage of the primary dwelling. Official source
  • Government Code Section 66315 states that Section 66314 establishes the maximum standards that a local agency shall use to evaluate a proposed accessory dwelling unit on a lot that includes a proposed or existing single-family dwelling, and that no additional standards, other than those provided in Section 66314, shall be used or imposed, including an owner-occupant requirement, except that a local agency may require that the property may be used for rentals of terms 30 days or longer. Section 66315 was added by Stats. 2024, Ch. 7, Sec. 20 (SB 477), effective March 25, 2024. Official source

What can your Lomita lot allow?

Send your address for a site-specific ADU feasibility review and estimate.

Lomita ADU questions

Does Lomita have its own building department for ADU permits?
Yes. The city states that it now provides all Building and Safety services, including plan check, permitting and inspections, and that all records from the Los Angeles County Building and Safety Division have been transferred to the city. Building and Safety sits inside City Hall and uses the GeoCivix Building and Permitting Portal for plan submittal, fee payment, permit issuance and inspection requests.
How much does the City of Lomita charge for plan review?
The citywide Master Fee Schedule effective June 4, 2025 lists Pre-Review for Building Permit at $187.13 and Pre-Application Meeting at $418.30. The same schedule lists LA County Building Fees at 100% above the county fee under Resolution No. 99-21, a General Plan Update Fee of 5% of the building permit fee, and Grading Plan Check for up to 1,000 cubic yards at $196.77 plus a consultant or LA County cost.
How long does the City of Lomita have to decide an ADU application?
The city has to approve or deny a complete application within 60 days, and it has to say in writing within 15 business days whether the application is complete. If the city does not act within 60 days the application is deemed approved. An applicant who asks for a delay stops that clock for the length of the delay.
How big can an ADU be in Lomita?
A detached unit can have a total floor area of up to 1,200 square feet with a setback of no more than four feet from the side and rear lot lines. The city also has to allow a unit with at least 800 square feet of interior livable space built with four foot side and rear yard setbacks. A junior ADU cannot be larger than 500 square feet.
Do I need parking for an ADU in Lomita?
State law caps parking at one space per unit or per bedroom, whichever is less, and off street parking can go in a setback area or be tandem parking on the driveway. No replacement parking can be required when a garage, carport, covered parking structure or uncovered space is demolished for the ADU or converted into one, and no parking standard applies within one-half of one mile walking distance of public transit, in a historic district, where a car share vehicle sits within one block, or where on street parking permits are required but not offered to the occupant.
Does Lomita publish pre-approved ADU plans?
No. The city publishes a planning submittal checklist, a permitted use table and a citywide master fee schedule, but no stock ADU plan sets for homeowners to pick from. That means the plan set gets drawn for your lot, and the checklist states that a title report is needed at submittal for new development on an undeveloped lot, and that a survey prepared by a licensed surveyor or registered civic engineer is required for all new buildings and additions.