L SQUAREDESIGN & BUILD
Get your free quote
Compton ADU Builder

ADU Builder in Compton, CA: City Rules, Permit Costs and Timeline

An ADU in Compton needs a city permit under ordinance 2341, a decision on a complete application within 60 days, and a plan that answers the state's 2025 review findings. L Square prefab unit prices run from $180,000 to $354,000. Call (949) 374-7980.

What are the ADU rules in Compton?

Compton's ADU ordinance is Ordinance No. 2341, adopted December 28, 2021, and it is the ordinance the state housing department reviewed on April 9, 2025. HCD found thirteen numbered problems with it. The city ordinance caps a separate unit at 16 feet and caps an attached unit at the height of the primary dwelling, while state law allows 18 feet for a separate unit within one half of one mile of a major transit stop and 25 feet for a unit attached to the primary dwelling. The ordinance also required a deed restriction on the property, which state law bars, limited a junior ADU to space inside the house, and told staff to act on an application within 60 days rather than approve or deny it. HCD also asked the city to confirm whether it allows one converted ADU, one separate new build and one junior ADU on the same single family lot. Confirm the current ordinance with the city planning counter before you design.

How long does it take to get an ADU permit in Compton?

A complete Compton ADU application must be decided within 60 days, and state law sets a 15 business day deadline for the city to say in writing whether the application is complete. If the city does not act within 60 days the application is approved by operation of law, and an applicant who requests a delay stops that clock for the length of the delay. The state's review letter gave Compton 30 days to respond, by May 9, 2025, and HCD said it must notify the city and may notify the state attorney general if the ordinance is not brought into compliance. HCD also found the city's housing element out of compliance with state law, so the rules on this page may still change. Build the plan set, submit a complete application, and treat 60 days as the outside limit rather than a target.

How much does an ADU cost in Compton?

L Square publishes configured prefab unit prices the same way for every project: $180,000 for Model 600, $240,000 for Models 800A and 800B, $295,000 for Models 1000A and 1000B, and $354,000 for Model 1200. Those are unit prices, not a final project total for a specific house. A Compton quote also carries the site work the lot needs, such as utility connections and trenching, grading on a sloped pad, drainage work and structural engineering. Write those line items into the proposal so you can see what the lot adds to the price.

What fees can the City of Compton charge for an ADU?

State law caps what Compton can charge for an ADU in two ways. No impact fee may be imposed on an ADU of 750 square feet of interior livable space or less, or on a junior ADU of 500 square feet or less, and an impact fee above 750 square feet must be charged in proportion to the square footage of the primary dwelling. A unit built without a new single family dwelling on the lot is not treated as a new residential use for water and sewer connection fees or capacity charges. The city's own plan check and permit fee schedule is not posted on its ADU page, so ask the planning counter for the current schedule and put it in the budget.

What should I check before building an ADU in Compton?

Five checks decide whether a Compton lot can take a unit. Size and height: the plan has to clear the state floors, which include a unit of at least 800 square feet of interior livable space with four foot side and rear yard setbacks, and the 16 foot height allowance. Lot coverage and open space: the city may not apply a rule that would block that unit. Parking: the city may not require more than one space per unit or per bedroom, and no parking standard applies within one half of one mile of a transit stop. Utilities: the city may not require a new utility connection and a related fee for a unit built without a new single family dwelling. Condition of existing structures: the city may not deny an application over unpermitted structures that do not threaten public health or safety.

Does the City of Compton publish free ADU plans?

Compton publishes four conceptual ADU plan sets at no charge. The city prepared them with the Southern California Association of Governments: Plan 447 for a one bedroom unit, Plan 650 for a one bedroom unit, Plan 750 for a two bedroom unit and Plan 1000 for a three bedroom unit, each in a slab foundation and a raised foundation version. Plans 447, 650 and 750 are for building permit review only, while Plan 1000 needs Planning ARB review. The sets carry no site plan, structural details or energy calculations, so you add your own, and the plans must be used as they are. The city also posts ADU handouts in English and Spanish covering new ADUs, ADU conversions and junior ADUs. The city's ADU page still points to an older code section that state law moved into the 66310 to 66342 range, so confirm the current rules with the planning counter.

Official Compton ADU sources

  • HCD reviewed Compton ADU Ordinance No. 2341, adopted December 28, 2021, and issued written findings on April 9, 2025 that the ordinance does not comply with state ADU law, listing thirteen numbered deficiencies. The city had up to 30 days to respond, no later than May 9, 2025, and HCD said it must notify the city and may notify the state attorney general if the ordinance is not brought into compliance. Official source
  • In its notice of violation on the sixth cycle housing element, HCD wrote that Compton's element was due October 15, 2021, that the city's most recent draft is not in substantial compliance with Housing Element Law, and that the city is therefore in violation of that law. HCD records show the city submitted an initial draft on February 7, 2024, a subsequent draft on July 25, 2024, and a second subsequent draft on January 6, 2025. Official source
  • HCD issued a reminder letter to Compton on November 23, 2021 that the city was required to revise its housing element for the sixth cycle planning period, and stated that HCD had not received a draft housing element submittal from the city, so the city no longer complied with state housing element law. Official source
  • HCD issued a notice of violation to Compton on September 29, 2022 for failure to adopt a compliant sixth cycle housing element and asked the city to provide a written response to the findings by October 29, 2022. The letter states that a local government without a substantially compliant housing element cannot rely on inconsistency with zoning and general plan standards as a basis for denial of a housing project for very low, low, or moderate-income households. Official source
  • The City of Compton publishes four conceptual ADU plan sets at no charge, prepared with the Southern California Association of Governments: Plan 447 for a one bedroom unit, Plan 650 for a one bedroom unit, Plan 750 for a two bedroom unit and Plan 1000 for a three bedroom unit, each in a slab foundation and a raised foundation version. The plans carry no site plan, structural details or energy calculations, must be used as they are, and Plan 1000 requires Planning ARB review. Official source
  • California Government Code Section 66317 requires a permitting agency to give written notice of whether an application is complete no later than 15 business days after receiving it, and to approve or deny a complete application within 60 days of receiving it. If the agency has not acted within 60 days the application is deemed approved, and if the applicant requests a delay the 60 day period is tolled for the period of the delay. Official source
  • California Government Code Section 66314 sets the state floor for city ADU rules: the total floor area for a separate new build may not exceed 1,200 square feet, no more than four feet of setback from the side and rear lot lines may be required, parking for an accessory dwelling unit may not exceed one space per unit or per bedroom, and parking spaces demolished for an ADU need not be replaced. Official source
  • California Government Code Section 66321 bars local size rules stricter than the state floor. A city may not set a maximum below eight hundred fifty square feet of interior livable space, or one thousand square feet for a unit that provides more than one bedroom, and it must permit a unit with at least 800 square feet of interior livable space and four foot side and rear yard setbacks. Height must allow at least 16 feet, or 18 feet for a unit within one half of one mile walking distance of a major transit stop. Official source
  • California Government Code Section 66311.5 says a local agency, special district or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less, or a junior accessory dwelling unit that has 500 square feet of interior livable space or less, and that an accessory dwelling unit shall not be treated as a new residential use for calculating water and sewer connection fees or capacity charges unless it was built with a new single family dwelling. Official source
  • California Government Code Section 66322 says a local agency shall not impose any parking standards for an accessory dwelling unit where the unit is within one half of one mile walking distance of public transit, in a historic district, part of the primary residence or an accessory structure, when on street parking permits are required but not offered to the occupant, or when a car share vehicle is within one block. The section also bars denial of an ADU permit over nonconforming conditions that do not threaten public health or safety. Official source
  • California Government Code Section 66315 says no additional standards other than those provided in Section 66314 shall be used or imposed for an accessory dwelling unit, including an owner-occupant requirement, except that a local agency may require that the property may be used for rentals of terms 30 days or longer. Official source
  • California Government Code Section 66323 requires a local agency to ministerially approve an application for a building permit to create one accessory dwelling unit and one junior accessory dwelling unit per lot with a proposed or existing single family dwelling, including one separate new construction accessory dwelling unit that does not exceed four foot side and rear yard setbacks. Official source
  • California Government Code Section 66326 sets out the review process for local ADU ordinances. A local agency must submit an adopted ordinance to the state housing department within 60 days, and if the agency does not act on written findings within 30 days the ordinance is null and void and the agency must apply state ADU law when permitting ADUs until it adopts a compliant ordinance. The department may notify the California Office of the Attorney General that the local agency is in violation of state law. Official source

What can your Compton lot allow?

Send your address for a site-specific ADU feasibility review and estimate.

Compton ADU questions

Does Compton's ADU ordinance comply with California law?
The state housing department said no on April 9, 2025. HCD reviewed Compton's Ordinance No. 2341, adopted December 28, 2021, and found thirteen numbered problems, including a 16 foot height cap, a deed restriction requirement, and wording that told staff to act on an application rather than approve or deny it. The city had 30 days to respond, by May 9, 2025, and HCD said it must notify the city and may notify the state attorney general if the ordinance stays as written.
How many ADUs can I build on a Compton lot?
State law lets a city approve one ADU and one junior ADU per lot with a single family dwelling, including one separate new build that meets four foot side and rear yard setbacks. HCD asked Compton to confirm that its ordinance allows all three on one lot, because the department had a complaint that the city was allowing only one such unit per single family lot. Ask the planning counter how the city counts a converted unit and a new build on the same lot.
How tall can an ADU be in Compton?
Compton's ordinance sets 16 feet for a separate unit and the height of the primary dwelling for an attached unit. State law allows 18 feet for a separate unit within one half of one mile walking distance of a major transit stop, and 25 feet or the primary dwelling height for an attached unit. HCD told the city to amend its ordinance to match those allowances, so the number on your plan should follow the state floor.
Do I need to provide parking for an ADU in Compton?
State law caps parking at one space per unit or per bedroom, whichever is less, and no parking standard applies to a unit within one half of one mile walking distance of public transit, inside a historic district, inside the house or an accessory structure, where on street parking permits are required but not offered to the occupant, or where a car share vehicle sits within one block. Compton's ordinance lists five cases where replacement parking is not required, and HCD asked the city to add the case where the ADU is filed with a new single family dwelling on the same lot.
How much does an ADU cost in Compton?
$180,000 for Model 600, $240,000 for Models 800A and 800B, $295,000 for Models 1000A and 1000B, and $354,000 for Model 1200 are L Square's configured prefab unit prices. A Compton project also carries site work such as utility connections, grading, drainage and structural engineering, and the city's permit and plan check fees are set by its own schedule. Ask the city for that schedule before you sign.
Can I put a deed restriction on a Compton ADU?
Not as a condition of the permit. HCD told Compton to remove that requirement, because Gov. Code Section 66315 says no additional standards may be used beyond those in Section 66314, including an owner occupancy requirement, except that the city may require rentals of 30 days or longer. A deed restriction would be an additional standard, so the city cannot require one when it issues the permit.

Ready to start
your ADU?

Get a free, no-pressure quote from a licensed design-build team, and a plan drawn around your lot.

Scroll to Top