Junior ADU in Santa Ana

What’s an ADU—and what’s a Junior ADU (JADU)?

An ADU (Accessory Dwelling Unit) is a secondary home on the same lot as a primary residence, with its own permanent living, sleeping, cooking, and sanitation facilities. A JADU (Junior Accessory Dwelling Unit) is a smaller ADU—up to 500 sq ft—that must be created entirely within an existing or proposed single-family home or its attached garage. A JADU can share a bathroom with the main house, but it needs its own exterior entrance and an efficiency kitchen. City of Santa Ana

In Santa Ana, you can build one JADU per parcel that already has a single-family home. JADUs are not allowed on properties with multifamily dwellings or multiple single-family homes. City of Santa Ana


Why homeowners choose a JADU in Santa Ana

Key benefits

  • Lower build cost than a detached ADU because you’re converting existing space. Typical garage/JADU conversions in Orange County run roughly $80,000–$150,000, with many JADUs landing around $50,000–$100,000 depending on scope and finishes. GsaDusGreatBuildz+1

  • Faster approvals: ADU/JADU permits are ministerially approved within 60 days of a complete application—no hearings. If denied, the city must return a full list of fixes. California State Assembly

  • Flexible use: keep family close, create a home office or caregiver suite, or add long-term rental income. (ADUs and JADUs are part of California’s strategy to expand infill housing.) California State Assembly

  • No impact fees for units up to 750 sq ft—your JADU (≤500 sq ft) qualifies. California State Assembly

  • Parking breaks: No parking is required for a JADU in Santa Ana; converting a garage doesn’t require replacing those spaces. City of Santa Ana


Types of ADUs (and when each makes sense)

Detached ADU (stand-alone backyard home)

  • Best for maximum privacy and highest rental rates.

  • Typical OC build cost $180,000–$400,000+ (design, site work, and finishes drive variation). GreatBuildz

Attached ADU (addition to the house)

  • Great when you can expand the footprint and tie into existing utilities.

  • Santa Ana caps attached/detached ADUs at 1,000 sq ft (subject to state “66323” allowances noted below). City of Santa Ana

Conversion ADU (inside existing structure)

  • Converts basements, storage rooms, or detached/attached garages. Garage conversions typically $80,000–$150,000. GsaDus

Junior ADU (JADU)

  • ≤500 sq ft, inside the existing (or proposed) single-family home/attached garage; may share a bathroom. One per parcel with a single-family home. City of Santa Ana+1


“Do I need a Junior ADU—or a different ADU?”

Choose a JADU if…

  • You have an underused bedroom, den, or attached garage and want a lower-cost, quicker conversion.

  • You’re okay with a shared bath (optional) and no separate utility meters.

  • You only need up to 500 sq ft and want to avoid impact fees and parking requirements. California State AssemblyCity of Santa Ana

Choose a full ADU if…

  • You want more space (up to 1,000 sq ft in Santa Ana’s local standards; see state “66323 Units” below for guaranteed minimums). City of Santa Ana

  • You need totally separate living (private bath required) and the highest rental value.

  • You’re comfortable with a larger budget (detached often $180k–$400k+). GreatBuildz


Zoning & permitting in Santa Ana (what to expect)

Where JADUs/ADUs are allowed

  • Single-family lots: 1 ADU and 1 JADU are permitted when standards are met. California State Assembly

  • Multifamily lots: You can add multiple conversion ADUs (up to 25% of unit count) and up to two detached ADUs; no JADUs on multifamily properties. Check local standards. City of Santa Ana

Size & setbacks (local standards)

  • ADUs: Up to 1,000 sq ft (attached or detached) under Santa Ana’s development standards; side/rear setbacks 4 ft (state-level “66323” category guarantees at least an 800-sq-ft option with 4-ft setbacks). City of Santa AnaCalifornia State Assembly

  • JADUs: ≤500 sq ft and must be within the existing/proposed house/attached garage; they follow the underlying zoning standards for the primary building (no extra setback when converting existing attached space). City of Santa Ana

Parking

  • No parking required for JADUs; no replacement parking when converting a garage to ADU/JADU. City of Santa Ana

Timelines & process

  • Santa Ana issues ministerial decisions within 60 days of a complete application; denials must include specific corrections. California State Assembly

  • Santa Ana also offers Pre-Approved ADU Plans to reduce design time/cost for detached units (you can still customize site-specific items). City of Santa Ana


Costs in Santa Ana & Orange County (realistic 2025 ranges)

JADU (conversion inside home/attached garage)

  • ~€46,000–€92,000 ($50,000–$100,000) for many projects; complex upgrades push higher. GreatBuildz

  • Garage/JADU conversions commonly $80,000–$150,000 depending on scope. GsaDusGreatBuildz

Full ADU

  • Detached ADU: $180,000–$400,000+ in OC. Some projects land outside this range based on size (500–1,000 sq ft), finishes, and site work. GreatBuildz

  • Cost drivers: utilities upgrades, foundation/soil, fire/life-safety, and design/permit “soft costs.” Regional per-sq-ft guides for SoCal often pencil $300–$400+/sq ft all-in. GreatBuildzSnapadu

Impact fees: California exempts ADUs ≤750 sq ft from impact fees—this includes every JADU by definition. Larger ADUs may pay proportionate fees only. California State Assembly


California’s latest ADU/JADU laws you should know (2023–2025)

Headline updates (plain English)

  • Code renumbered (SB 477, 2024): State ADU/JADU law moved from Gov. Code §§65852.2/65852.22 to §§66310–66342. If you see old citations online, they’re now 663xx sections. California State Assembly

  • 60-day approvals clarified: Cities must approve or deny ADU/JADU permits within 60 days and provide complete written corrections if denying. California State Assembly

  • Owner-occupancy (AB 976, 2023): Local agencies cannot require owner-occupancy for ADUs (note: this does not remove the separate owner-occupancy rules that may still apply to JADUs under state law). California State Assembly

  • Sell an ADU as a condo? (AB 1033, 2023): Cities may opt-in to allow separate sale of an ADU via condo mapping; it’s not automatic—check if Santa Ana adopts an ordinance. California State Assembly

  • Pre-approved plans (AB 1332, 2023 → 2025): Cities must run ADU plan pre-approval programs; Santa Ana already offers pre-approved detached plans. California State AssemblyCity of Santa Ana


How to move forward (simple plan)

Step 1 — Spot your best candidate space (10 minutes)

H4: Quick self-check

  • Do you have an extra bedroom/den or an attached garage? You likely qualify for a JADU (≤500 sq ft). City of Santa Ana

  • Need >500 sq ft or total independence? Look at a full ADU (attached/detached). City of Santa Ana

Step 2 — Budget with a realistic band

Step 3 — Confirm local fit & timeline

Step 4 — Choose drawings

  • JADU/Conversion: hire a designer familiar with Santa Ana submittals.

  • Detached ADU: consider Santa Ana’s Pre-Approved Plans to shorten design/plan check. City of Santa Ana


FAQ (fast answers)

What’s the maximum size for a JADU?

500 sq ft, inside the existing/proposed home or attached garage. City of Santa Ana

Do I need parking?

No for JADUs. And no replacement parking when converting a garage. City of Santa Ana

How long will permitting take?

By state law, within 60 days of a complete application (ministerial). California State Assembly

Can I sell my ADU separately?

Only if Santa Ana opts into AB 1033 with a local ordinance—check current city policy. California State Assembly


Bottom line

If you want the fastest, most affordable way to add livable space or rental potential in Santa Ana, a JADU is often the sweet spot: ≤500 sq ft, no parking required, no impact fees, and 60-day ministerial approvals. If you need more space or full independence, step up to a full ADU (attached or detached) and budget accordingly. City of Santa AnaCalifornia State AssemblyGreatBuildz


Tip: Before you design, check whether your lot is within ½ mile of transit—many ADUs get automatic parking exemptions, and garage conversions don’t need replacement spaces. That can materially reduce cost and complexity. California State Assembly

Scroll to Top